Pages

Monday, July 13, 2009

PaceHouse 2.1 Project List (First Draft)

  • Trellis for patio
  • New couch
  • Master bedroom closet system (see closet fail)
  • Hot Tub
  • Paint master bathroom
  • New dresser for EJP
  • Fix fan in master
  • Replace dead plant area on hill
  • Replace small, cat friendly gravel with suitable alternative in SKGP garden
  • Work area / computer lab in kids' study
  • Replace portion on back lawn with additional raised garden bed
  • Install ceiling fan in SKGP's room
  • Replace futon in library
  • Replace front lawn with synthetic turf
  • Install emergency water tank
  • Install rainwater capture / cistern system
  • Install solar panels
  • Fix damaged exterior on van
  • Install organizational system in garage
  • Tankless water heater
  • Water softener
  • TBD
Completion date: 1/1/2010?
Budget: I don't want to know

No comments:

Post a Comment